AQI 0.00% 1.5¢ alicanto minerals limited

Ann: Diamond Drill Program Commences at Ianna, Guyana, page-35

  1. 2,381 Posts.
    lightbulb Created with Sketch. 429
    Clearly NFI, have you ever spoken to management about how they perform assays?

    I have, in detail, the cores (which are extremely heavy) are shipped by barge and then ship to a lab in Australia, transportation time takes a lot longer but is a lot cheaper than flying them out and given AQI are trying to control costs this transportation option is the reason for the lapsed time between drilling and any indication of results.
    Last edited by refresher: 08/11/17
 
watchlist Created with Sketch. Add AQI (ASX) to my watchlist
(20min delay)
Last
1.5¢
Change
0.000(0.00%)
Mkt cap ! $10.47M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
2 292051 1.5¢
 

Sellers (Offers)

Price($) Vol. No.
1.7¢ 30000 1
View Market Depth
Last trade - 16.12pm 15/08/2024 (20 minute delay) ?
AQI (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.