KTA 9.09% 1.2¢ krakatoa resources limited

Ann: Diamond Drill Program Update, Turon Gold Project, page-3

  1. 87 Posts.
    lightbulb Created with Sketch. 3
    Diamond Drill Program Update, Turon Gold Project

     Diamond drill program at the Turon Gold Project, Lachlan Fold Belt progressing smoothly:
    o 2 drill holes (BD001 and BD002) at Britannia Mine complete
    o Drill rig mobilised to Quartz Ridge, drill hole QRD001 has commenced

     Positive indicators for mineralisation returned in both holes at Britannia:
    o Broad zones of significant quartz veining, pervasive sericite alteration and
    disseminated pyrite-arsenopyrite
    o Prominent vein quartz reef intersected, interpreted as representing Nobby's Reef, a
    historically noted gold-bearing quartz reef
    o 2 subparallel vertical faults intersected, interpreted as the controlling structures for
    mineralisation at the Britannia Mine also intersected in both holes

     Alteration-style encountered at the Britannia Mine similar to shear-hosted gold deposits
    such as Spring Gully, 10km east of Turon
 
watchlist Created with Sketch. Add KTA (ASX) to my watchlist
(20min delay)
Last
1.2¢
Change
0.001(9.09%)
Mkt cap ! $5.429M
Open High Low Value Volume
1.1¢ 1.2¢ 1.1¢ $3.571K 312.5K

Buyers (Bids)

No. Vol. Price($)
2 195835 1.2¢
 

Sellers (Offers)

Price($) Vol. No.
1.3¢ 756594 4
View Market Depth
Last trade - 10.54am 20/06/2024 (20 minute delay) ?
KTA (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.