Diamond Drill Program Update, Turon Gold Project
Diamond drill program at the Turon Gold Project, Lachlan Fold Belt progressing smoothly:
o 2 drill holes (BD001 and BD002) at Britannia Mine complete
o Drill rig mobilised to Quartz Ridge, drill hole QRD001 has commenced
Positive indicators for mineralisation returned in both holes at Britannia:
o Broad zones of significant quartz veining, pervasive sericite alteration and
disseminated pyrite-arsenopyrite
o Prominent vein quartz reef intersected, interpreted as representing Nobby's Reef, a
historically noted gold-bearing quartz reef
o 2 subparallel vertical faults intersected, interpreted as the controlling structures for
mineralisation at the Britannia Mine also intersected in both holes
Alteration-style encountered at the Britannia Mine similar to shear-hosted gold deposits
such as Spring Gully, 10km east of Turon
- Forums
- ASX - By Stock
- Ann: Diamond Drill Program Update, Turon Gold Project
Diamond Drill Program Update, Turon Gold Project Diamond drill...
-
- There are more pages in this discussion • 163 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KTA (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.0¢ |
Change
-0.001(4.76%) |
Mkt cap ! $4.721M |
Open | High | Low | Value | Volume |
1.0¢ | 1.0¢ | 1.0¢ | $700 | 70K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 1530000 | 1.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.1¢ | 409242 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 1530000 | 0.010 |
16 | 3076019 | 0.009 |
11 | 942995 | 0.008 |
7 | 1621000 | 0.007 |
3 | 1335999 | 0.006 |
Price($) | Vol. | No. |
---|---|---|
0.011 | 409242 | 5 |
0.012 | 375500 | 3 |
0.013 | 100001 | 1 |
0.014 | 469556 | 1 |
0.015 | 39799 | 1 |
Last trade - 15.00pm 31/10/2024 (20 minute delay) ? |
Featured News
KTA (ASX) Chart |