    So RNX expect to be drilling between 31 to 45 metres per day.

    Is it possible to extrapolate what they now expect to be drilling through based on their expected drilling speed? Do we get
    slower speed of drilling through ore bearing bodies as opposed to non ore bearing bodies?
 