FBM 5.26% 2.0¢ future battery minerals limited

AOU started 1,200m of diamond drilling at the Leinster Project...

  1. 2,749 Posts.
    lightbulb Created with Sketch. 1065

    AOU started 1,200m of diamond drilling at the Leinster Project on 25 March 2021. Two months ago and no results reported to date.

    AOU announcement on 25 May 2021 included the following update:

    "Drilling continues at the Leinster Nickel Project at the Woodwind Prospect, located directly along strike
    from the known high-grade nickel sulphide mineralisation at the Horn Prospect. To-date, five diamond
    holes for 1,660m and seven RC holes for 1,300m have been completed. Assays are pending for all
    holes, with first batch of results expected in the coming weeks. DHEM has been scheduled for next
    week for all completed drill-holes."

    https://hotcopper.com.au/data/attachments/3214/3214564-6b57fb3597e711317ef75d5ebe65b098.jpg


    Completed more drilling than originally planned. Let's hope this is a positive sign.

    Looks like another few weeks before we receive assay news.

    Slowness in reporting results is depressing the share price. I am holding tight.

    GLTAHs


 
watchlist Created with Sketch. Add FBM (ASX) to my watchlist
(20min delay)
Last
2.0¢
Change
0.001(5.26%)
Mkt cap ! $13.24M
Open High Low Value Volume
2.0¢ 2.0¢ 2.0¢ $4.309K 215.4K

Buyers (Bids)

No. Vol. Price($)
1 190403 2.0¢
 

Sellers (Offers)

Price($) Vol. No.
2.1¢ 94433 2
View Market Depth
Last trade - 13.51pm 21/08/2024 (20 minute delay) ?
FBM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.