Jimone , these are the short term targets outlined by mgt in May 2018
Now- Cascavel to reach commercial production in May 2018.- Cash flow positive May 2018
What are your key goals for the next 3, 6 and 12 months?
3 Months:
Cascavel reaches 2,000 ounces per month.
6 Months:
Complete drilling at Antena and Tintiero’s cobalt sampling. Sertao restsrt drilling (5 holes in pit) and study complete.
12 Months:
Cascavel reaches 5,000 ounces per month and Antena and Sertao restart production.
DYOR
- Forums
- ASX - By Stock
- Ann: Diamond Drilling Results 21.7m @ 4.49 g/t at Antena-Xupe
Jimone , these are the short term targets outlined by mgt in May...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add OGX (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online