IR1 3.70% 28.0¢ iris metals limited

Ann: Diamond Drilling to Commence at the Beecher Project, page-47

  1. 521 Posts.
    lightbulb Created with Sketch. 263
    Ok so Beecher has a good history of lithium mining. Big chunks. Ok. Got some good grades. 2 phases of drilling. First looks promising, good grade, good intersection. Second held up till mid this month.
    Now here's the kicker-decided to progress with DD at Beecher before RC results are back. What. Who has that sort of confidence. Do these guys know something we don't. Chat to the lab or really like what is coming out. Big area but they have decided to drill before latest assays arrive. Anyhow very interesting.
 
watchlist Created with Sketch. Add IR1 (ASX) to my watchlist
(20min delay)
Last
28.0¢
Change
0.010(3.70%)
Mkt cap ! $42.74M
Open High Low Value Volume
28.0¢ 36.0¢ 25.5¢ $82.35K 262.8K

Buyers (Bids)

No. Vol. Price($)
1 27 29.5¢
 

Sellers (Offers)

Price($) Vol. No.
31.5¢ 12964 1
View Market Depth
Last trade - 14.43pm 17/06/2024 (20 minute delay) ?
Last
29.5¢
  Change
0.010 ( 3.11 %)
Open High Low Volume
30.0¢ 34.5¢ 29.5¢ 102878
Last updated 14.29pm 17/06/2024 ?
IR1 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.