IR1 2.27% 45.0¢ iris metals limited

Ann: Diamond Drilling to Commence at the Beecher Project, page-48

  1. 2,650 Posts.
    lightbulb Created with Sketch. 178
    good point@Swift4. DD would be costly unless previous drill boost the confidence. I got my rough plan below for the next 6 months:

    Catalyst 1: BD projected resource estimate thru assay results. Hope this give good uptick in total MRE
    Catalyst 2: Stacked pegs system confirmation (DD visual interception) which is common in T1 deposit. This potentially is a game changer for Beecher project alone
    Catalyst 3: BD stacked under Beecher and Long View via further drilling toward year end

    Cat 1 tick would give SP surpass $4 to $7
    Cat 2 tick would likely give MC surpass 1B (~$6 - $10 per share)
    Cat 3 tick potentially give MC reach 2B short term (~$12 - $18 per share)

    There are many variance in terms of thickness, length, grade, Lithium price performance etc. so projected MCs are all just speculative at this point.

    There are other news would come in between including Edison Mine sampling, Licensing, addition acquisition for extension, investment from big guys via CR etc.

    I got AZS projected MC once right so hopefully score it once again.
 
watchlist Created with Sketch. Add IR1 (ASX) to my watchlist
(20min delay)
Last
45.0¢
Change
0.010(2.27%)
Mkt cap ! $58.29M
Open High Low Value Volume
44.0¢ 45.0¢ 41.0¢ $136.5K 323.3K

Buyers (Bids)

No. Vol. Price($)
1 73814 43.0¢
 

Sellers (Offers)

Price($) Vol. No.
45.5¢ 1500 1
View Market Depth
Last trade - 15.56pm 24/05/2024 (20 minute delay) ?
Last
45.0¢
  Change
0.010 ( 3.31 %)
Open High Low Volume
42.5¢ 45.0¢ 41.0¢ 105745
Last updated 15.59pm 24/05/2024 ?
IR1 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.