MLS 5.26% 2.0¢ metals australia ltd

Ann: Diamond Drilling Update at Lac Rainy Graphite Project, page-19

  1. 2,225 Posts.
    lightbulb Created with Sketch. 133
    We should now be just past the halfway point through the Phase II drilling. Two more weeks to go then all samples should have been sent for analysis and testing. No reason it needs to wait extra weeks for demobilisation of equipment.
 
watchlist Created with Sketch. Add MLS (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.