I think you are conflating separate things here. One slide is about ASNs DLE partner, the other slide is about a development site.
Remember they are replicating the Sunresin process flowsheet at the demo plant onsite at Green River. The brine chemistry in the Green River region is expected to be very similar to that of the Paradox project, given they target the same continuous lithologies. Why would ASN start from scratch at GR with a different DLE tech provider? Makes no sense.
The presso was mostly rehash. My main take-away is they have reiterated their intent to push hard with GR given the lack of regulatory / bureaucratic headwind (such as they are experiencing at Paradox).
- Forums
- ASX - By Stock
- ASN
- Ann: Direct Lithium Extraction Conference Presentation
Ann: Direct Lithium Extraction Conference Presentation, page-38
-
- There are more pages in this discussion • 67 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ASN (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.8¢ |
Change
-0.001(1.27%) |
Mkt cap ! $105.6M |
Open | High | Low | Value | Volume |
7.9¢ | 7.9¢ | 7.6¢ | $218.3K | 2.832M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 58797 | 7.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.8¢ | 108279 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 58797 | 0.077 |
2 | 43000 | 0.076 |
12 | 354141 | 0.075 |
6 | 402823 | 0.074 |
10 | 1047712 | 0.073 |
Price($) | Vol. | No. |
---|---|---|
0.078 | 108279 | 4 |
0.079 | 255271 | 1 |
0.080 | 719091 | 3 |
0.081 | 1196140 | 4 |
0.082 | 658609 | 3 |
Last trade - 16.10pm 18/10/2024 (20 minute delay) ? |
Featured News
ASN (ASX) Chart |