Yes indeed 2105. Good progress made in the last month with the installation of the crushing, screening and material handling equipment as well as the commencement and erection of the Main Process Building. Aerials as follows:
August 2022 Aerial
July 2022 Aerial
- Forums
- ASX - By Stock
- G6M
- Ann: Dolphin Tungsten MIne Development Update
Ann: Dolphin Tungsten MIne Development Update, page-3
-
- There are more pages in this discussion • 26 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add G6M (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $25.10M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
G6M (ASX) Chart |
Day chart unavailable