The 5,934m Reverse Circulation (RC) drill programme within the Dome North area at the Pioneer Dome
Project was completed in late August. As announced on 15 October3
, four RC holes drilled in the upper zone
of the Cade Deposit returned broad high-grade intercepts, with highlights of:
• 21m @ 1.08% Li2O from surface (PDRC589)
• 24m @ 1.29% Li2O from surface (PDRC590)
• 15m @ 1.06% Li2O from 47m (PDRC591)
• 26m @ 1.46% Li2O from 51m (PDRC592)
Also, hole PDRC519, located at the southern end of the Davy deposit, returned encouraging assays of:
• 7m @ 1.02% Li2O from 21m, including 3m @ 1.44% Li2O; and
• 9m @ 0.62% Li2O from 42m
Ann: Dome North lithium drill programme to commence, page-2
Add to My Watchlist
What is My Watchlist?