The 5,934m Reverse Circulation (RC) drill programme within the Dome North area at the Pioneer Dome Project was completed in late August. As announced on 15 October3 , four RC holes drilled in the upper zone of the Cade Deposit returned broad high-grade intercepts, with highlights of: • 21m @ 1.08% Li2O from surface (PDRC589) • 24m @ 1.29% Li2O from surface (PDRC590) • 15m @ 1.06% Li2O from 47m (PDRC591) • 26m @ 1.46% Li2O from 51m (PDRC592) Also, hole PDRC519, located at the southern end of the Davy deposit, returned encouraging assays of: • 7m @ 1.02% Li2O from 21m, including 3m @ 1.44% Li2O; and • 9m @ 0.62% Li2O from 42m
ESS Price at posting:
22.0¢ Sentiment: Buy Disclosure: Held