I'd be surprised if SFR are analysing the core samples in their own (Grade Control) lab for a few reasons..
1. Contamination is a real issue. Commercial labs separate their grade control and exploration prep areas for this reason.
2. Looking at Table 1 from the RC hole ann (20/07) They are using a Microwave Assisted Digest technique (MAD) and an ICP finish. The MAD setup would be overkill for a site lab
3. Using hydrofluoric acid in a lab means a hell of a lot more paperwork, effort and cash, on account of how dangerous this stuff is. Also probably not necessary, as a good old fashioned aqua-regia would do the trick on site.
4. Samples get despatched off site (I assume from Degrussa) by the sounds of it.
So I think they are sending them off site. And two-week turnaround is standard for commercial labs, well at least SGS and ALS who I use fairly regularly. But this raises a couple of questions. Why were results from the DD holes received so quickly? After all, DD samples require more prep than RC. It sure as hell shouldn't take 3 weeks, so I agree that SFR may very well be holding out.
Best thing we can hope for is that the Cu grades were so high that they had to be re-assayed by a concentrate analysis titration technique! Ah well, one can dream.
- Forums
- ASX - By Stock
- Ann: Doolgunna Project - Drilling Update
I'd be surprised if SFR are analysing the core samples in their...
-
- There are more pages in this discussion • 14 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TLM (ASX) to my watchlist
(20min delay)
|
|||||
Last
27.0¢ |
Change
0.015(5.88%) |
Mkt cap ! $50.84M |
Open | High | Low | Value | Volume |
27.5¢ | 27.5¢ | 25.5¢ | $101.6K | 390.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 11320 | 26.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
27.0¢ | 78186 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 11320 | 0.260 |
1 | 12367 | 0.255 |
2 | 66000 | 0.250 |
2 | 60000 | 0.245 |
4 | 145000 | 0.235 |
Price($) | Vol. | No. |
---|---|---|
0.270 | 78186 | 1 |
0.275 | 8908 | 1 |
0.280 | 19559 | 1 |
0.295 | 18000 | 1 |
0.300 | 42000 | 2 |
Last trade - 16.10pm 21/06/2024 (20 minute delay) ? |
Featured News
TLM (ASX) Chart |
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online