just looking at the report again, it states ( CYS drilled 12 holes, at 5 locations for a total depth of 1172 metres) i would of thought this could of been written up better, does that mean each hole was drilled to this depth, or were the total no. of meters drilled (1172m). 1172 div. 12 =97m/per hole not that deep, DHEM will be the tool to use from here. also for a geo to state the appearance of copper this needs to be reworked,OIMO. i think the company will take some heart from this. also AUC doing some work close by, results cant be to far away, they may have some clue`s. OIMO>
- Forums
- ASX - By Stock
- Ann: DOOLGUNNA WEST COPPER-GOLD PROJECT
just looking at the report again, it states ( CYS drilled 12...
-
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
NEWS
Antler Copper Project hits major permitting milestone – air quality permit advances to final review
Add PIL (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.7¢ |
Change
-0.001(12.5%) |
Mkt cap ! $14.84M |
Open | High | Low | Value | Volume |
0.7¢ | 0.7¢ | 0.7¢ | $10.99K | 1.570M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
22 | 13369346 | 0.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.7¢ | 180000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
21 | 13285846 | 0.006 |
13 | 12506433 | 0.005 |
6 | 13750000 | 0.004 |
6 | 18166670 | 0.003 |
4 | 9300006 | 0.002 |
Price($) | Vol. | No. |
---|---|---|
0.007 | 180000 | 1 |
0.008 | 3810822 | 9 |
0.009 | 5692296 | 11 |
0.010 | 7521301 | 11 |
0.011 | 7420090 | 7 |
Last trade - 15.22pm 04/10/2024 (20 minute delay) ? |
Featured News
PIL (ASX) Chart |