PGS kicked off the K3Dseis on Sunday (19th May). Rmf-Hyp is doing a NW-SE loop & will switch accordingly.
Timeframe for the survey over the Development area is 40 days and another 70 for the rest of the outer perimeter. Total 110 days, after which its processing & handing over the data to the client for analysis etc. STO had D4 pencilled in WNW from D3 in their 240 page Survey dossier, so not sure if its still on for now. Would b nice if it was slotted in b4 rig release. This additional step-out well ~2.5kms from D3 would give them another control point over the structure as far as the net/gross thickness goes for the well-tie's & volumetric calc's over the core part of the structure.
- Forums
- ASX - By Stock
- Ann: Dorado-2 drilling update
PGS kicked off the K3Dseis on Sunday (19th May). Rmf-Hyp is...
-
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CVN (ASX) to my watchlist
(20min delay)
|
|||||
Last
14.5¢ |
Change
-0.005(3.33%) |
Mkt cap ! $259.4M |
Open | High | Low | Value | Volume |
15.0¢ | 15.0¢ | 14.5¢ | $260.6K | 1.776M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
14 | 1647050 | 14.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
15.0¢ | 408931 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
14 | 1647050 | 0.145 |
14 | 2377994 | 0.140 |
3 | 462000 | 0.135 |
4 | 529300 | 0.130 |
1 | 257502 | 0.125 |
Price($) | Vol. | No. |
---|---|---|
0.150 | 193931 | 3 |
0.155 | 869157 | 16 |
0.160 | 842989 | 15 |
0.165 | 245510 | 7 |
0.170 | 477678 | 10 |
Last trade - 16.10pm 13/09/2024 (20 minute delay) ? |
Featured News
CVN (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online