CVN 0.00% 19.5¢ carnarvon energy limited

Ann: Dorado-2 Drilling Update, page-40

  1. Ya
    6,809 Posts.
    lightbulb Created with Sketch. 3828
    An efficient crew & a decent formation (as in no jamming of core in the barrel etc etc) makes the coring job easier. They had cut 120m at Roc-2 & that was pretty fast as well.

    Update is as expected. Logs & fluid sample frm the MDT r whats reqd once they drill to TD. Gives them around 748m of open hole to log so around 7-10 days.

    U could refer to slide-81 from STO's investor presentation last year on the link below.

    Those squiggly lines r the gamma log response to Sand packets intersected at D1 and this was pretty thick in the Caley which is what they were expecting to intersect at D2 albiet 2.2kms downdip. Drilling at D3 back on the crest (near D1) should b a no brainer assuming no mechanical issues etc, need to see the flowrates.

    https://www.asx.com.au/asxpdf/20180926/pdf/43yn1n8mgbmp0b.pdf
    Last edited by Ya: 29/05/19
 
watchlist Created with Sketch. Add CVN (ASX) to my watchlist
(20min delay)
Last
19.5¢
Change
0.000(0.00%)
Mkt cap ! $348.8M
Open High Low Value Volume
19.5¢ 20.0¢ 19.5¢ $386.1K 1.979M

Buyers (Bids)

No. Vol. Price($)
6 425882 19.5¢
 

Sellers (Offers)

Price($) Vol. No.
20.0¢ 256926 7
View Market Depth
Last trade - 16.10pm 28/06/2024 (20 minute delay) ?
CVN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.