yeah they've mentioned that, so it will b interesting to see who farms-in for say 30-35%. Also a contingent payment will b paid to Quadrant after certain milestone Reserves are certified.
They've modelled Dorado as a 62k bopd developmnt scenario (net 50k-STO) which should see development via lateral wells as it appears to b a simple structure with the reservoir dipping down towards Northeast.
In my view, the JV should drill couple more stepout wells next year after this 2.2 kms is derisked. Then its a matter of casting the net wider, i.e, stepout 1.5 to 2 kms until the Caley sands r fully water wet. Market wont like that bit of news, however their Reservoir Engineers & Development Team would need that sub-surface data to place Water injector wells down-dip to flush the oil out at the Crestal location. Swingby next week, not much to add.
- Forums
- ASX - By Stock
- CVN
- Ann: Dorado-2 Drilling Update
Ann: Dorado-2 Drilling Update, page-83
-
- There are more pages in this discussion • 338 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CVN (ASX) to my watchlist
|
|||||
Last
15.5¢ |
Change
-0.005(3.13%) |
Mkt cap ! $286.2M |
Open | High | Low | Value | Volume |
15.5¢ | 15.5¢ | 15.5¢ | $31.40K | 202.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 526306 | 15.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
16.0¢ | 466279 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 13190 | 0.165 |
1 | 3125 | 0.160 |
3 | 401632 | 0.155 |
20 | 1135194 | 0.150 |
10 | 545088 | 0.145 |
Price($) | Vol. | No. |
---|---|---|
0.155 | 2600 | 1 |
0.160 | 407879 | 4 |
0.165 | 2153836 | 6 |
0.170 | 553821 | 12 |
0.175 | 662192 | 8 |
Last trade - 10.02am 25/07/2024 (20 minute delay) ? |
Featured News
CVN (ASX) Chart |
The Watchlist
LGP
LITTLE GREEN PHARMA LTD
Paul Long, CEO
Paul Long
CEO
Previous Video
Next Video
SPONSORED BY The Market Online