yeah they've mentioned that, so it will b interesting to see who farms-in for say 30-35%. Also a contingent payment will b paid to Quadrant after certain milestone Reserves are certified.
They've modelled Dorado as a 62k bopd developmnt scenario (net 50k-STO) which should see development via lateral wells as it appears to b a simple structure with the reservoir dipping down towards Northeast.
In my view, the JV should drill couple more stepout wells next year after this 2.2 kms is derisked. Then its a matter of casting the net wider, i.e, stepout 1.5 to 2 kms until the Caley sands r fully water wet. Market wont like that bit of news, however their Reservoir Engineers & Development Team would need that sub-surface data to place Water injector wells down-dip to flush the oil out at the Crestal location. Swingby next week, not much to add.
- Forums
- ASX - By Stock
- Ann: Dorado-2 Drilling Update
yeah they've mentioned that, so it will b interesting to see who...
-
- There are more pages in this discussion • 338 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CVN (ASX) to my watchlist
(20min delay)
|
|||||
Last
20.5¢ |
Change
0.005(2.50%) |
Mkt cap ! $366.6M |
Open | High | Low | Value | Volume |
20.0¢ | 20.5¢ | 20.0¢ | $724.4K | 3.558M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
6 | 279612 | 20.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
20.5¢ | 485773 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 264612 | 0.200 |
8 | 320521 | 0.195 |
9 | 404631 | 0.190 |
17 | 2825895 | 0.185 |
9 | 873001 | 0.180 |
Price($) | Vol. | No. |
---|---|---|
0.205 | 254527 | 3 |
0.210 | 632027 | 14 |
0.215 | 436870 | 7 |
0.220 | 710364 | 14 |
0.225 | 303106 | 6 |
Last trade - 16.10pm 21/06/2024 (20 minute delay) ? |
Featured News
CVN (ASX) Chart |
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online