Hard to be definitive without knowing their development concept, but my guess would be 12-18 months for a project like this. There's nothing particularly challenging about it in terms of engineering complexity, its all been done many times before, but these things take time and shortcuts taken at FEED often lead to project cost and/or schedule blow-outs. Remember that this is just for the FEED, detailed engineering then follows at the EPC stage, assuming that is their contracting strategy. Often the FEED is contracted to an EPC company anyway.
- Forums
- ASX - By Stock
- CVN
- Ann: Dorado-3 Wireline Results Support Flow Testing
Ann: Dorado-3 Wireline Results Support Flow Testing, page-199
-
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CVN (ASX) to my watchlist
(20min delay)
|
|||||
Last
16.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $295.1M |
Open | High | Low | Value | Volume |
16.5¢ | 17.0¢ | 16.0¢ | $636.5K | 3.866M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
8 | 624083 | 16.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
17.0¢ | 745415 | 12 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
8 | 624083 | 0.165 |
8 | 348052 | 0.155 |
12 | 1672628 | 0.150 |
23 | 939657 | 0.145 |
12 | 482777 | 0.140 |
Price($) | Vol. | No. |
---|---|---|
0.170 | 745415 | 12 |
0.175 | 683239 | 10 |
0.180 | 753475 | 10 |
0.185 | 888213 | 7 |
0.190 | 803888 | 3 |
Last trade - 16.10pm 04/10/2024 (20 minute delay) ? |
Featured News
CVN (ASX) Chart |