CVN 2.44% 20.0¢ carnarvon energy limited

Hard to be definitive without knowing their development concept,...

  1. 873 Posts.
    lightbulb Created with Sketch. 343
    Hard to be definitive without knowing their development concept, but my guess would be 12-18 months for a project like this. There's nothing particularly challenging about it in terms of engineering complexity, its all been done many times before, but these things take time and shortcuts taken at FEED often lead to project cost and/or schedule blow-outs. Remember that this is just for the FEED, detailed engineering then follows at the EPC stage, assuming that is their contracting strategy. Often the FEED is contracted to an EPC company anyway.
 
watchlist Created with Sketch. Add CVN (ASX) to my watchlist
(20min delay)
Last
20.0¢
Change
-0.005(2.44%)
Mkt cap ! $357.7M
Open High Low Value Volume
20.0¢ 20.5¢ 20.0¢ $377.2K 1.884M

Buyers (Bids)

No. Vol. Price($)
8 517767 19.5¢
 

Sellers (Offers)

Price($) Vol. No.
20.5¢ 944125 15
View Market Depth
Last trade - 16.10pm 04/07/2024 (20 minute delay) ?
CVN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.