CVN 2.56% 20.0¢ carnarvon energy limited

Ann: Dorado-3 Wireline Results Support Flow Testing, page-199

  1. 866 Posts.
    lightbulb Created with Sketch. 337
    Hard to be definitive without knowing their development concept, but my guess would be 12-18 months for a project like this. There's nothing particularly challenging about it in terms of engineering complexity, its all been done many times before, but these things take time and shortcuts taken at FEED often lead to project cost and/or schedule blow-outs. Remember that this is just for the FEED, detailed engineering then follows at the EPC stage, assuming that is their contracting strategy. Often the FEED is contracted to an EPC company anyway.
 
watchlist Created with Sketch. Add CVN (ASX) to my watchlist
(20min delay)
Last
20.0¢
Change
0.005(2.56%)
Mkt cap ! $357.5M
Open High Low Value Volume
20.0¢ 21.0¢ 19.5¢ $1.576M 7.841M

Buyers (Bids)

No. Vol. Price($)
18 927045 19.5¢
 

Sellers (Offers)

Price($) Vol. No.
20.0¢ 346117 6
View Market Depth
Last trade - 16.10pm 09/05/2024 (20 minute delay) ?
Last
19.8¢
  Change
0.005 ( 0.00 %)
Open High Low Volume
19.8¢ 20.5¢ 19.8¢ 3636973
Last updated 15.58pm 09/05/2024 ?
CVN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.