Well that's staying in the ground.8Mt @ 1.2g/t for 320Koz I said it was a dud 18 months ago and copped a heap of flak.
PH2 Hydrogen at a crossroads: Plug Power, Pure Hydrogen and Nel ASA between opportunity and crisis – Your profit strategy