Roughly 200m capex as I predicted but confirmation in the DFS. DFS should absolutely smoke Hastings.
- Forums
- ASX - By Stock
- Ann: Downstream Processing at Longonjo Project
Roughly 200m capex as I predicted but confirmation in the DFS....
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)