BUX 11.4% 7.8¢ buxton resources limited

Ann: Downstream Processing Success at Graphite Bull Project, page-11

  1. 3,914 Posts.
    lightbulb Created with Sketch. 12485
    These results are very good. Can't recall what RNU's progress was at this stage of their development but I do recall 50% yield being what was used in their study.

    so to replicate that and on first go, unoptimised, acid free process flow sheet is excellent.

    Looking extremely robust and this is a massive de-risk. anzaplan is a global leader in this space so if anything we might see better results from their run.

    Now just to get the infill/expansion drilling complete and the feasibility study. one of the best graphite projects in Australia in terms of risk verse reward.

    significant de-risking off this announcement.

    SF2TH
 
watchlist Created with Sketch. Add BUX (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.