26
th November, 2014
ASX Release,
By e-lodgement
First drill core assays significantly upgrade copper grades at Moubiri
Highlights
• Assays significantly upgrade copper grades in majority of drill holes.
• Main “DSO” mineralised zone (ZK130401) increased width and grade:
o 8.55m (down hole) @ 11.9% Cu, 29.6% Pb, 19.4% Zn and 159.2g/t Ag
• Significant increase in copper grade in the sandstone unit:
o 17m @ 5.1% Cu (XRF result) increased to 16.7m @ 11.0% (assay result)
o 9.4m @ 3.8% Cu (XRF result) increased to 9.5m @ 6.2% (assay result)
o 12.4m @ 5.6% Cu (XRF result) increased to 15.7m @ 9.0% (assay result)
AusAmerican Mining Limited (ASX: AIW) (“AusAmerican” or “the company”) is pleased to report
the first drill core assay results from the Moubiri due diligence program.
Shenglong Investments International Ltd (“Shenglong”) previously drilled 14 diamond core holes
for a total of 2,688 metres during 2013 of which 2 key holes intercepted the Moubiri production
ore body. As part of AusAmerican’s due diligence program the company has logged the drill holes,
supervised analyses by handheld XRF and the cutting/sampling of the drill core. The preliminary
XRF results were released on 23rd Oct. The drill core was assayed by Acme Laboratories(Vancouver)
by 4 acid digest with an ICP finish and has consistently returned higher copper grades than
originally published. Major intersections are as follows:
Hole Id From To Interval (m) True Width (m) Cu % Pb % Zn % Ag g/t
ZK130401 38.4 55.1 16.7 7.3 11.0 0.6 2.1 33.5
ZK130401 85.1 93.65 8.55 3.8 11.9 29.6 19.4 159.2
MZK004 88.0 97.5 9.5 4.2 6.2 - - 10.2
MZK007 7.0 11.0 4 1.8 13.2 - - 20.5
MZK007 25.9 41.6 15.7 6.9 9.0 - - 116.4
MZK011 27.0 59.0 32 14.1 2.0 - - -
Table 1: Major drill intersections from Moubiri diamond drill core
The results again give significant credibility to the company'sshort term business plan in increasing
production at Moubiri over the next six months to 200-250 tonnes per day with all key due
diligence results to date confirming the company's current production model.
Sincerely,
Jim Malone
CEO/Company Secretary
- Forums
- ASX - By Stock
- Ann: Drill core assays significantly increase Cu grade at Moubiri
26 th November, 2014 ASX Release, By e-lodgement First drill...
-
- There are more pages in this discussion • 195 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add WML (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $4.875M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 381400 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.2¢ | 381399 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 381400 | 0.003 |
21 | 22048047 | 0.002 |
32 | 91475397 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.002 | 381399 | 1 |
0.003 | 28189932 | 22 |
0.004 | 5881657 | 11 |
0.005 | 2895379 | 5 |
0.006 | 4220305 | 4 |
Last trade - 09.10am 02/10/2024 (20 minute delay) ? |
Featured News
WML (ASX) Chart |
Day chart unavailable
The Watchlist
TON
TRITON MINERALS LTD
Adrian Costello, Executive Director
Adrian Costello
Executive Director
Previous Video
Next Video
SPONSORED BY The Market Online