4,500 METRE DRILL PROGRAM UNDERWAY AT THE MASSIGUI PROJECT, MALI
Highlights
Aircore (AC) rig has commenced drilling, with a second Reverse Circulation (RC)
drill rig mobilizing to the Project area shortly.
A total of 4,500 metres of drilling planned as part of an aggressive multifaceted
exploration campaign to test multiple gold targets.
Drilling will increase drill density and extend drill coverage along strike from known
shallow gold zones at Viper Prospect.
Additional drilling to test depth extensions to recent ore-grade drill intersections at
Viper Prospect.
High potential gold targets at Koble, Koting, and Koura Prospects to be evaluated in
this phase of drilling.
Aggressive, multifaceted, exploration program continues to systematically identify
and test high quality targets.
- Forums
- ASX - By Stock
- FFX
- Ann: Drill Program Underway at the Massigui Project, Mali
Ann: Drill Program Underway at the Massigui Project, Mali, page-2
-
- There are more pages in this discussion • 47 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)