it happened at the last minute.
The drill site is ready and the rig was going to be dropped.
Hugh told me he is going over there to sort it out.
I asked is it a serious issue. He said no.
Hopefully its a quick fix!
Possibly a good time to average down??
- Forums
- ASX - By Stock
- PAT
- Ann: Drill Program Update
Ann: Drill Program Update, page-7
-
- There are more pages in this discussion • 34 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PAT (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.4¢ |
Change
-0.001(2.86%) |
Mkt cap ! $3.621M |
Open | High | Low | Value | Volume |
3.5¢ | 3.5¢ | 3.4¢ | $351 | 10.21K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 20000 | 3.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.4¢ | 47786 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 2214 | 0.034 |
1 | 20000 | 0.031 |
3 | 63332 | 0.030 |
1 | 35000 | 0.028 |
1 | 21860 | 0.027 |
Price($) | Vol. | No. |
---|---|---|
0.036 | 2109 | 1 |
0.042 | 29144 | 1 |
0.043 | 150000 | 1 |
0.045 | 100000 | 1 |
0.048 | 50000 | 1 |
Last trade - 11.21am 10/09/2024 (20 minute delay) ? |
Featured News
PAT (ASX) Chart |