If you take their figures of strike length of 450m, width of 250m and depth of up to 200m, they should get a much larger figure than the current exploration target of 12-18Mt for this section with higher grades. My back of the envelope figure comes to around 70Mt using those numbers so will be keen to see the rest of the drilling results.