looks like they are setup already, so at 60-70m per day (as per last campaign) and target length (not depth) of 1600m, should be finished in about 3.5 weeks.
first hole at this collar was at 90 degrees DIP, this hole is at 80 degrees which will level out to 65 degrees around the 1200m mark, that is where all the good stuff is going off the results from the first hole. The chances of large intersection here are much much better than the first hole because we already have the first hole done. Really looking forward to this one
- Forums
- ASX - By Stock
- Ann: Drill Rig On Site at Horse Well & Other Key Milestones
looks like they are setup already, so at 60-70m per day (as per...
-
- There are more pages in this discussion • 36 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ALR (ASX) to my watchlist
|
|||||
Last
0.4¢ |
Change
-0.001(12.5%) |
Mkt cap ! $15.03M |
Open | High | Low | Value | Volume |
0.4¢ | 0.4¢ | 0.4¢ | $17.85K | 5.1M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
24 | 51131421 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 3859847 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
24 | 51131421 | 0.003 |
13 | 14033324 | 0.002 |
15 | 26400889 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 3859847 | 5 |
0.005 | 17985605 | 15 |
0.006 | 8166411 | 12 |
0.007 | 550000 | 3 |
0.008 | 1109710 | 2 |
Last trade - 15.53pm 21/06/2024 (20 minute delay) ? |
Featured News
ALR (ASX) Chart |
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online