ITM 1.43% 7.1¢ itech minerals ltd

Ann: Drill Targets Defined at Scimitar Copper-Gold Prospect, page-20

  1. mvc
    3,115 Posts.
    lightbulb Created with Sketch. 305
    My thoughts exactly, any rain is sporadic but can be enough to stop work for a few weeks while it drains away, the thing that does happen is very high temperatures and the humidity can be higher than expected. The heat can slow down the process of drilling because it is just too hot in the middle of the day.

    Will be interesting to see an announcement on drilling.


 
watchlist Created with Sketch. Add ITM (ASX) to my watchlist
(20min delay)
Last
7.1¢
Change
0.001(1.43%)
Mkt cap ! $11.95M
Open High Low Value Volume
7.0¢ 7.1¢ 6.9¢ $30.60K 434.9K

Buyers (Bids)

No. Vol. Price($)
1 393 7.1¢
 

Sellers (Offers)

Price($) Vol. No.
7.2¢ 91875 3
View Market Depth
Last trade - 13.08pm 11/09/2024 (20 minute delay) ?
ITM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.