Without x prom. NWE was a bit of a different story to be fair. It was drilling contractor who stuffed up the cementing job on the liner and the discovery had already been confirmed.
We still don’t know what we have for sure here and although I agree it’s a contractor stuff up to not have the right kit on the rig re BOPE there should be someone from BNL checking these things as it’s our first drill since change in legislation and needed to get it right to avoid future scrutiny.
- Forums
- ASX - By Stock
- Ann: Drilling and Permitting Update
Without x prom. NWE was a bit of a different story to be fair....
-
- There are more pages in this discussion • 59 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BNL (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $9.724M |
Open | High | Low | Value | Volume |
0.4¢ | 0.4¢ | 0.4¢ | $2.292K | 582.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
56 | 52207084 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 11824811 | 17 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
52 | 50783139 | 0.003 |
24 | 27766892 | 0.002 |
11 | 52500025 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 9334811 | 11 |
0.005 | 10673370 | 13 |
0.006 | 6376568 | 9 |
0.007 | 3771436 | 7 |
0.008 | 4382001 | 8 |
Last trade - 16.10pm 04/10/2024 (20 minute delay) ? |
Featured News
BNL (ASX) Chart |