ESS 0.00% 50.0¢ essential metals limited

Ann: Drilling at Pioneer Dome Lithium Project to Commence-PIO.AX, page-2

  1. SRV
    3,252 Posts.
    lightbulb Created with Sketch. 37
    Drilling starts 30th August at Pioneer Dome

    First drill holes to target PEG008, a 1.7 km long suite of mapped, differentiated pegmatites with a coincident lithium soil geochemistry anomaly;

    Programme of approximately 5,000m RC drilling, testing PEG001, PEG002 and PEG008;

    Subject to results, additional RC and diamond core drilling can immediately follow;

    Laboratory results expected during late September and October 2016;

    Additional soil geochemistry (halted due to rain) to be progressively completed to extend anomalies generated between PEG003 and PEG007 inclusive.
 
watchlist Created with Sketch. Add ESS (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.