ASR 0.00% 0.6¢ asra minerals limited

Ann: Drilling Begins at Mt Stirling Gold Project, page-15

  1. 4,994 Posts.
    lightbulb Created with Sketch. 3990
    Considering that the rig is going to Diorite East Block first for 9-10 holes for a total of 1000m of drilling I can bet that this will all be RC drilling so they will be sampling as they drill and maybe knocking out 1 or 2 holes per day if they are only 100m drill holes, then bagging and sampling is pretty fast so could be sending samples away to labs in a week or two. As others have said - samples will end up in logistically logical "batches" i.e. whatever fits on a sample cage/ute/trailer/truck and then anywhere from 1-4 weeks for assay turn results (labs pretty busy at the moment I expect).

    The second part of the drilling is the 15,000m Mt StirlingDiorite Block which surely will have some deeper slower RC drilling and maybe even a few diamond tails on some of the deepest holes (I can see at least one 450-500m length hole on a cross section so that would be diamond drill core). Logging and sampling diamond drill core takes longer but presuming they are later in the drill program and making the assumption/ leap of logic that they drill the shallower easier RC holes first and then work up to the deeper diamond core later I wouldn't be surprised if there are still assays pending near the end of the year.
 
watchlist Created with Sketch. Add ASR (ASX) to my watchlist
(20min delay)
Last
0.6¢
Change
0.000(0.00%)
Mkt cap ! $12.95M
Open High Low Value Volume
0.6¢ 0.6¢ 0.6¢ $500 83.33K

Buyers (Bids)

No. Vol. Price($)
10 23064798 0.5¢
 

Sellers (Offers)

Price($) Vol. No.
0.6¢ 253022 3
View Market Depth
Last trade - 09.59am 06/09/2024 (20 minute delay) ?
ASR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.