Considering that the rig is going to Diorite East Block first for 9-10 holes for a total of 1000m of drilling I can bet that this will all be RC drilling so they will be sampling as they drill and maybe knocking out 1 or 2 holes per day if they are only 100m drill holes, then bagging and sampling is pretty fast so could be sending samples away to labs in a week or two. As others have said - samples will end up in logistically logical "batches" i.e. whatever fits on a sample cage/ute/trailer/truck and then anywhere from 1-4 weeks for assay turn results (labs pretty busy at the moment I expect).
The second part of the drilling is the 15,000m Mt StirlingDiorite Block which surely will have some deeper slower RC drilling and maybe even a few diamond tails on some of the deepest holes (I can see at least one 450-500m length hole on a cross section so that would be diamond drill core). Logging and sampling diamond drill core takes longer but presuming they are later in the drill program and making the assumption/ leap of logic that they drill the shallower easier RC holes first and then work up to the deeper diamond core later I wouldn't be surprised if there are still assays pending near the end of the year.
- Forums
- ASX - By Stock
- ASR
- Ann: Drilling Begins at Mt Stirling Gold Project
Ann: Drilling Begins at Mt Stirling Gold Project, page-15
-
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ASR (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.6¢ |
Change
0.000(0.00%) |
Mkt cap ! $12.95M |
Open | High | Low | Value | Volume |
0.6¢ | 0.6¢ | 0.6¢ | $500 | 83.33K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
10 | 23064798 | 0.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.6¢ | 253022 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 83335 | 0.006 |
10 | 23064798 | 0.005 |
9 | 9536262 | 0.004 |
9 | 7146986 | 0.003 |
7 | 7550101 | 0.002 |
Price($) | Vol. | No. |
---|---|---|
0.006 | 336357 | 3 |
0.007 | 9516779 | 8 |
0.008 | 12646417 | 12 |
0.009 | 4400000 | 4 |
0.010 | 4675000 | 6 |
Last trade - 09.59am 06/09/2024 (20 minute delay) ? |
Featured News
ASR (ASX) Chart |