Nothing like seeing the spod crystals in the drill cores, unfortunately all takes time….same happened at wr1, released the visual cores which were late and also announced no more visuals…now only lab results…
They all release visual cores first off if it’s sexy, then give an estimate that of length and possible percentage…
The asx are very picky that the info is released in a table, wr1 was pinged for showing the pegs etc but didn’t conform length and spodumene, so the announcement was re-released following a please explain…
we saw with forrestania hit a 60m+ peg but no confirmation of spod, and down they went after the clarification….unfortunately all takes time
- Forums
- ASX - By Stock
- SLM
- Ann: Drilling commenced at Jaguar Lithium Project, Brazil
Ann: Drilling commenced at Jaguar Lithium Project, Brazil, page-215
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SLM (ASX) to my watchlist
|
|||||
Last
9.5¢ |
Change
-0.003(3.06%) |
Mkt cap ! $7.335M |
Open | High | Low | Value | Volume |
9.7¢ | 9.7¢ | 9.5¢ | $9.462K | 98.53K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 176926 | 9.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
9.8¢ | 55917 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 176926 | 0.095 |
1 | 10985 | 0.091 |
1 | 11627 | 0.086 |
1 | 10000 | 0.085 |
1 | 12345 | 0.081 |
Price($) | Vol. | No. |
---|---|---|
0.098 | 55917 | 1 |
0.099 | 4333 | 1 |
0.105 | 40000 | 1 |
0.110 | 427641 | 7 |
0.120 | 12000 | 1 |
Last trade - 13.13pm 14/06/2024 (20 minute delay) ? |
|
|||||
Last
9.5¢ |
  |
Change
-0.003 ( 3.06 %) |
|||
Open | High | Low | Volume | ||
9.6¢ | 9.6¢ | 9.5¢ | 37526 | ||
Last updated 12.59pm 14/06/2024 ? |
Featured News
SLM (ASX) Chart |