CBE 3.80% 8.2¢ cobre limited

Ann: Drilling Commenced in Botswana, page-41

  1. 19 Posts.
    lightbulb Created with Sketch. 6
    No that’s not correct. The KML ground around T3 (endurance and perseverance) was picked up after it was dropped by MOD as they (hopefully) misinterpreted the ground and believed it was a syncline - so the supposed mineralisation was sloping down to depth. The KML team reinterpreted the data and believe there is a continuation of the dome structure from A4 to T3 and to these targets. They are also looking to hit the NPF contact with these DD holes.

    What’s different to this KML drilling is that *pretty much anything* economical will likely end up being be mined because the T3 pit and processing facility is so close. And IF there is any hint of serious resource then things will get very interesting very quickly.

    Clearly some PIs are starting to take positions. A few Twitter names are also driving interest. Excellent.
 
watchlist Created with Sketch. Add CBE (ASX) to my watchlist
(20min delay)
Last
8.2¢
Change
0.003(3.80%)
Mkt cap ! $27.15M
Open High Low Value Volume
8.0¢ 8.2¢ 8.0¢ $15.14K 186.1K

Buyers (Bids)

No. Vol. Price($)
1 2250 8.0¢
 

Sellers (Offers)

Price($) Vol. No.
8.2¢ 15472 1
View Market Depth
Last trade - 16.10pm 27/05/2024 (20 minute delay) ?
Last
8.2¢
  Change
0.003 ( 2.50 %)
Open High Low Volume
8.1¢ 8.2¢ 7.9¢ 23748
Last updated 15.59pm 27/05/2024 ?
CBE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.