@jimone 'The lab will be 100% up and running by the end of the week, so assay results should be delivered on time.'
These cores will be assayed in a certified lab so they can be included in a JORC. So return time will be longer - they are talking April.
.
- Forums
- ASX - By Stock
- OGX
- Ann: DRILLING COMMENCES AT ANTENA - XUPE DEPOSITS
Ann: DRILLING COMMENCES AT ANTENA - XUPE DEPOSITS, page-9
-
- There are more pages in this discussion • 177 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)