RTR 2.70% 3.8¢ rumble resources limited

Ann: Drilling Commences at Earaheedy Project, page-17

  1. 3,015 Posts.
    lightbulb Created with Sketch. 8019
    Also some extensional preparation at Mato
    https://hotcopper.com.au/data/attachments/5736/5736303-f524ace3159af8cc9c6f6ec1b018cd71.jpg

    The SW extension of the first line is offset for topographic/drainage reasons. Thought..

    Western new line sites set up for scoping??

    Over the last month I have watched RTR on Sentinel and noticed some activity in the original Sweetwater West drill area.

    https://hotcopper.com.au/data/attachments/5736/5736372-d8c581f5933bf0ea9a560c248a597b7e.jpg

    Possibly quite a bit of drilling done. Sites mainly prepared earlier and only infilled now? Some 'blips' may be artifacts of imagery.
    https://hotcopper.com.au/data/attachments/5736/5736377-2a23c8068dfc3513233f1be06be2708b.jpg

 
watchlist Created with Sketch. Add RTR (ASX) to my watchlist
(20min delay)
Last
3.8¢
Change
0.001(2.70%)
Mkt cap ! $28.74M
Open High Low Value Volume
3.7¢ 3.8¢ 3.6¢ $25.73K 698.6K

Buyers (Bids)

No. Vol. Price($)
1 40000 3.5¢
 

Sellers (Offers)

Price($) Vol. No.
3.8¢ 320708 2
View Market Depth
Last trade - 16.10pm 01/07/2024 (20 minute delay) ?
RTR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.