MQR 0.00% 1.1¢ marquee resources limited

Ann: Drilling Commences at Kibby Basin Lithium Project, page-40

  1. 2,734 Posts.
    lightbulb Created with Sketch. 1786
    They started May 20. They’re drilling 2 holes using one rig. Running smoothly ( without problems) I’d expect 3 weeks per hole, so that’s 6 weeks all up I’d guess.
    After finish they may possibly cap it . That’s to built pressure up so the brine ( hopefully) will flow without pumping.
    As to an announcement, it depends on whether it’s at end of drilling, or a flow rate test etc.
 
watchlist Created with Sketch. Add MQR (ASX) to my watchlist
(20min delay)
Last
1.1¢
Change
0.000(0.00%)
Mkt cap ! $4.547M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
1 300000 1.1¢
 

Sellers (Offers)

Price($) Vol. No.
1.2¢ 116721 1
View Market Depth
Last trade - 16.12pm 05/07/2024 (20 minute delay) ?
MQR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.