SPQ 28.6% 0.9¢ superior resources limited

Ann: Drilling commences at large-scale Bottletree Copper Prospect, page-29

  1. 4,984 Posts.
    lightbulb Created with Sketch. 2650
    Timely posts Kemj. Think the previous application of modern methods should find the hot spot and why SPQ believe they are looking at Tier 1 copper/nickel deposits. First one first. The timing is good given the expected growth in demand as per the above video. SPQ have not wasted their capital albeit a bit slow due to Covid19. This will be compensated as the price rises. Very much ground floor until results come in. Drilling is continuing on the ground as planned.
 
watchlist Created with Sketch. Add SPQ (ASX) to my watchlist
(20min delay)
Last
0.9¢
Change
0.002(28.6%)
Mkt cap ! $18.01M
Open High Low Value Volume
0.8¢ 0.9¢ 0.8¢ $22.87K 2.826M

Buyers (Bids)

No. Vol. Price($)
2 940866 0.8¢
 

Sellers (Offers)

Price($) Vol. No.
0.9¢ 318378 3
View Market Depth
Last trade - 15.34pm 30/08/2024 (20 minute delay) ?
SPQ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.