Patience. They still had over 600 metres to drill to total depth after installing casing on the 8th.
Not sure how long casing takes to install but lets guess at 2 days.
Drilling at probably 100 metres per day will take 6 days.
If they stop drilling to run wireline logging of the G20 sands then this will increase drilling time.
They will need to run the wirline formation evaluation tool again after total depth is reached to analyse the lower sands under G20 formation. This may take a few days too.
I really do not expect news until the 20th in my opinion.
- Forums
- ASX - By Stock
- Ann: Drilling Commences at SM-6 well in Gulf of Mexico
Patience. They still had over 600 metres to drill to total depth...
Featured News
Add OEL (ASX) to my watchlist
|
|||||
Last
1.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $57.54M |
Open | High | Low | Value | Volume |
1.2¢ | 1.2¢ | 1.2¢ | $59.52K | 4.960M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
15 | 15574781 | 1.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.2¢ | 300152 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 2990142 | 0.012 |
15 | 15574781 | 0.011 |
14 | 20112232 | 0.010 |
3 | 6100000 | 0.009 |
3 | 285123 | 0.008 |
Price($) | Vol. | No. |
---|---|---|
0.013 | 8694284 | 13 |
0.014 | 7219489 | 11 |
0.015 | 4855572 | 8 |
0.016 | 145225 | 2 |
0.017 | 72000 | 1 |
Last trade - 10.45am 01/08/2024 (20 minute delay) ? |
Featured News
OEL (ASX) Chart |
The Watchlist
CCO
THE CALMER CO INTERNATIONAL LIMITED
Anthony Noble, CEO
Anthony Noble
CEO
SPONSORED BY The Market Online