“The Sisters Project is situated 1.75km east of Global Lithium’s (ASX:GL1) Archer lithium deposit, which hosts 10.5Mt @ 1.0% Li2O.
The project hosts the same greenstone belt as the Archer Deposit. Reconnaissance concentrated on the identification of outcropping lithium rich pegmatites in areas between the greenstone belt and the Homeward Granite contact.”
1.75km away GL1 Archer Lithium deposit in same greenstone belt has to make you excited for what could be ahead.
- Forums
- ASX - By Stock
- MRR
- Ann: Drilling commences over Sister's Lithium Project
Ann: Drilling commences over Sister's Lithium Project, page-2
-
- There are more pages in this discussion • 53 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MRR (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $8.678M |
Open | High | Low | Value | Volume |
0.8¢ | 0.8¢ | 0.8¢ | $6.698K | 837.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
18 | 13025896 | 0.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.9¢ | 4340818 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
18 | 13025896 | 0.008 |
8 | 2523513 | 0.007 |
3 | 1910000 | 0.006 |
4 | 2125000 | 0.005 |
3 | 1700000 | 0.004 |
Price($) | Vol. | No. |
---|---|---|
0.009 | 4340818 | 6 |
0.010 | 5134398 | 17 |
0.011 | 5196800 | 6 |
0.012 | 6886992 | 9 |
0.013 | 1152768 | 3 |
Last trade - 16.10pm 27/09/2024 (20 minute delay) ? |
Featured News
MRR (ASX) Chart |