HIGHLIGHTS
• 6 RC holes for 568m have been completed at Metzke’s Find with the target lode horizon
intersected in all holes
• Assay results are expected in July 2020
• Follow up drilling to commence at Rocky Dam by mid-July 2020
Dreadnought Managing Director, Dean Tuck, commented: “Dreadnought is pleased to have completed
follow up drilling at the historic high grade Metzke’s Find on time and on budget. The visual results are
encouraging, and we look forward to announcing the assay results during July 2020. In the meantime,
Dreadnought is gearing up for a return to Rocky Dam by mid-July to follow up on the recently drilled
thick near surface gold intercepts.
- Forums
- ASX - By Stock
- Ann: Drilling Complete at Metzkes Find
HIGHLIGHTS • 6 RC holes for 568m have been completed at Metzke’s...
-
- There are more pages in this discussion • 80 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add DRE (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.5¢ |
Change
-0.001(6.25%) |
Mkt cap ! $56.07M |
Open | High | Low | Value | Volume |
1.6¢ | 1.6¢ | 1.5¢ | $57.18K | 3.800M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
34 | 8657296 | 1.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.6¢ | 3375088 | 14 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
34 | 8657296 | 0.015 |
11 | 3019715 | 0.014 |
4 | 2020999 | 0.013 |
6 | 2719840 | 0.012 |
2 | 2300999 | 0.011 |
Price($) | Vol. | No. |
---|---|---|
0.016 | 3375088 | 14 |
0.017 | 1342010 | 13 |
0.018 | 4545224 | 8 |
0.019 | 482619 | 4 |
0.020 | 1183248 | 9 |
Last trade - 16.10pm 18/09/2024 (20 minute delay) ? |
Featured News
DRE (ASX) Chart |