Anyone know a rough cost for the drilling?
Cash reserves as of end of last quarter was $1.9m.
- staff costs = 270k approx?
- lab analyse cost? = maybe 25k?
- excavation costs
More and more I look at the balance sheet I think we will have to do a cap raise after any positive results released. (Should be any day)
Unless excavation costs were paid via shares/options but I couldn't find a reference of that anywhere.
If the selling does not recover we'll be looking at 8-9c cap raise. Whats everyone think?
Held/Hold
- Forums
- ASX - By Stock
- Ann: Drilling Completed at Port Gregory - Further Update
Anyone know a rough cost for the drilling? Cash reserves as of...
-
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add HVY (ASX) to my watchlist
|
|||||
Last
7.8¢ |
Change
-0.003(3.70%) |
Mkt cap ! $4.911M |
Open | High | Low | Value | Volume |
8.0¢ | 8.0¢ | 7.8¢ | $24.08K | 307.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 12658 | 7.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.0¢ | 2999 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 12658 | 0.079 |
1 | 19397 | 0.078 |
1 | 100000 | 0.077 |
2 | 60000 | 0.075 |
1 | 20000 | 0.074 |
Price($) | Vol. | No. |
---|---|---|
0.080 | 2999 | 1 |
0.087 | 33256 | 1 |
0.115 | 18000 | 1 |
0.120 | 27744 | 1 |
0.125 | 17707 | 1 |
Last trade - 12.24pm 25/07/2024 (20 minute delay) ? |
Featured News
HVY (ASX) Chart |