A cuban lab down the road is not the same cost as sending drill assays to SGS in Canada. Also, as part of the contract with the JV, exploration costs are reimbursed to AAU when a project is earmarked for construction. If the results were dusters at the cuban lab, then they would save a bucket load by not sending freight to Canada and having it tested their. I dare say now the historic drilling is being matched, and the initial diamond drilling program does the same, any drilling beyond that point will go straight to the Canadian lab. They need to prove the data they are going off is accurate, which they just have
- Forums
- ASX - By Stock
- Ann: Drilling Confirms Copper Mineralisation at El Pilar, Cuba
A cuban lab down the road is not the same cost as sending drill...
-
-
- There are more pages in this discussion • 144 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AAU (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.4¢ |
Change
0.001(16.7%) |
Mkt cap ! $6.495M |
Open | High | Low | Value | Volume |
0.4¢ | 0.4¢ | 0.4¢ | $109 | 31.01K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
76 | 60021003 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 13021829 | 9 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
76 | 60021003 | 0.003 |
44 | 67765069 | 0.002 |
16 | 66979950 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 13021829 | 9 |
0.005 | 16329453 | 16 |
0.006 | 8017660 | 10 |
0.007 | 14620314 | 9 |
0.008 | 16801000 | 8 |
Last trade - 10.24am 05/11/2024 (20 minute delay) ? |
Featured News
AAU (ASX) Chart |