TM1 10.5% 5.1¢ terra metals limited

Ann: Drilling Confirms Discovery of Large Cu-PGE Sulphide Reefs, page-388

  1. 125 Posts.
    lightbulb Created with Sketch. 4
    The Processing Plant includes, Primary Crusher,Secondary Crusher,Reclaimer,Vertical Roll Mill,Wet Plant,and other infrastructure. 30% completed includes,Civils, Foundation and small amount of construction in my opinion. Still along way to go for us,GR engineering are doing the construction, have a look on their website for design ect. I work for them.
 
watchlist Created with Sketch. Add TM1 (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.