TM1 17.6% 8.7¢ terra metals limited

The Processing Plant includes, Primary Crusher,Secondary...

  1. 80 Posts.
    lightbulb Created with Sketch. 2
    The Processing Plant includes, Primary Crusher,Secondary Crusher,Reclaimer,Vertical Roll Mill,Wet Plant,and other infrastructure. 30% completed includes,Civils, Foundation and small amount of construction in my opinion. Still along way to go for us,GR engineering are doing the construction, have a look on their website for design ect. I work for them.
 
watchlist Created with Sketch. Add TM1 (ASX) to my watchlist
(20min delay)
Last
8.7¢
Change
0.013(17.6%)
Mkt cap ! $31.70M
Open High Low Value Volume
7.4¢ 8.7¢ 7.2¢ $614.3K 7.731M

Buyers (Bids)

No. Vol. Price($)
4 301539 8.7¢
 

Sellers (Offers)

Price($) Vol. No.
8.9¢ 280101 3
View Market Depth
Last trade - 16.10pm 10/07/2024 (20 minute delay) ?
TM1 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.