Ann: Drilling Confirms Potential for World-Class Titanium Project, page-140

  1. 7,036 Posts.
    lightbulb Created with Sketch. 662
    Hello. PTR have now drilled most of the deposit. Similar to my last post, the brokers will be running their ruler over this announcement. However, we also require the results of the "mineral assemblage" because the degrees of "titanium purity" are most essential.

    Why would PTR need $10M? PTR must:

    1. Drill out the deposits with many more drill holes to produce at least an Indicated JORC.

    2. However, due to the relatively inexpensive nature of shallow drilling sand and due to the variability of the deposit, PTR may aim to drill out a Measured JORC, which requires even more drill holes.

    3. PTR must also do lots of metallurgical testing; probably including in commercial pilot plants and even with companies like Iluka or Tronox; to determine how efficiently their ore can be processed. There are mixed ores here and importantly they must determine how easily the "rutile" can be separated.

    4. Once PTR have at least an Indicated JORC, they can do a Scoping Study and then a costly Feasibility Study.

    5. PTR is no longer an exploration hopeful. PTR is now a developer of a major project.

    Regards


    Last edited by GKeden: 06/02/25
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
29.0¢
Change
0.000(0.00%)
Mkt cap ! $100.2M
Open High Low Value Volume
30.0¢ 30.0¢ 28.5¢ $39.00K 134.2K

Buyers (Bids)

No. Vol. Price($)
3 107953 28.5¢
 

Sellers (Offers)

Price($) Vol. No.
29.0¢ 15000 1
View Market Depth
Last trade - 15.41pm 17/06/2025 (20 minute delay) ?
PTR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.