Colin advised in the webinar that there wasn't enough material...

  1. 339 Posts.
    lightbulb Created with Sketch. 232
    Colin advised in the webinar that there wasn't enough material for the metallurgical/mineral assemblage. The drill holes in question were used for a different exploration program looking for RE. So by the time the material was retested for heavy metal/ titanium there wasn't enough to get full metallurgical/mineral assemblages.

    The metallurgical/mineral assemblage will be provided for the new 90+ hole we have drilled last month. Due later this month maybe early next.
    Last edited by Thebigonion: 06/03/25
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
29.5¢
Change
0.005(1.72%)
Mkt cap ! $100.2M
Open High Low Value Volume
30.0¢ 30.0¢ 29.5¢ $5.393K 18.27K

Buyers (Bids)

No. Vol. Price($)
2 25830 29.0¢
 

Sellers (Offers)

Price($) Vol. No.
30.0¢ 199970 5
View Market Depth
Last trade - 10.17am 17/06/2025 (20 minute delay) ?
PTR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.