AUZ 14.3% 0.8¢ australian mines limited

We don't disagree at all! There is the Feasibility Study, then...

  1. 13,430 Posts.
    lightbulb Created with Sketch. 2627
    We don't disagree at all!

    There is the Feasibility Study, then the Decision to Mine, then the Financing package, then the Detail Design, Environmental Studies and Approvals and then Construction.

    When they talk about 'optimising the BFS', they are surely talking about what is required before the Decision to Mine and the Funding - not the 'optimising' done during the detailed engineering design phase.
 
watchlist Created with Sketch. Add AUZ (ASX) to my watchlist
(20min delay)
Last
0.8¢
Change
0.001(14.3%)
Mkt cap ! $11.18M
Open High Low Value Volume
0.8¢ 0.8¢ 0.8¢ $760 94.97K

Buyers (Bids)

No. Vol. Price($)
40 10196179 0.7¢
 

Sellers (Offers)

Price($) Vol. No.
0.8¢ 473959 8
View Market Depth
Last trade - 10.00am 27/06/2024 (20 minute delay) ?
AUZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.